IECEx CoC Home > Certified Equipment Scheme > Certificate of Conformity
important information !
an IECEx Guest User | ExCB Login

leftca_pagelinks
IECEx Certificate
of Conformity

 
INTERNATIONAL ELECTROTECHNICAL COMMISSION
IEC Certification Scheme for Explosive Atmospheres
for rules and details of the IECEx Scheme visit www.iecex.com

 
Certificate No.:
IECEx TUN 11.0003X issue No.:1
 
Status:
Current
 
Date of Issue:2014-07-18 Page 1 of 4


    
Applicant:
Pepperl + Fuchs GmbH
Lilienthalstrasse 200
68307 Mannheim
Germany


 
Equipment:High Density Fieldbus Power Hub System
Optional accessory:


 
Type of Protection:Type of protection “n“


 
Marking:

Ex nAc IIC T4           or       Ex nA  IIC T4 Gc      resp.

Ex nAc nCc IIC T4   or       Ex nA nC IIC T4 Gc

 
Approved for issue on behalf of the IECEx
Certification Body:
Andreas Meyer

 
Position:Head of the IECEx CB


 
Signature:
(for printed version)
 
Date:
 
 
1. This certificate and schedule may only be reproduced in full.
2. This certificate is not transferable and remains the property of the issuing body.
3. The Status and authenticity of this certificate may be verified by visiting the Official IECEx Website.
 

 Certificate issued by:
TÜV NORD CERT GmbH
Hanover Office
Am TÜV 1
30519 Hannover
Germany


- PAGE BREAK -

IECEx Certificate
of Conformity

 
Certificate No.:IECEx TUN 11.0003X
 
Date of Issue:2014-07-18Issue No.: 1
 
Page 2 of 4
 
 Manufacturer:
Pepperl + Fuchs GmbH
Lilienthalstrasse 200
68307 Mannheim
Germany


 
 Additional Manufacturing location(s):
Pepperl & Fuchs PTE Ltd.
P+F Building
18 Ayer Rajah Crescent
Singapore 139942
Singapore
 

This certificate is issued as verification that a sample(s), representative of production, was assessed and tested and found to comply with the IEC Standard list below and that the manufacturer's quality system, relating to the Ex products covered by this certificate, was assessed and found to comply with the IECEx Quality system requirements. This certificate is granted subject to the conditions as set out in IECEx Scheme Rules, IECEx 02 and Operational Documents as amended.


STANDARDS:
The electrical apparatus and any acceptable variations to it specified in the schedule of this certificate and the identified documents, was found to comply with the following standards:

 
IEC 60079-0 : 2011
Edition: 6.0
Explosive atmospheres - Part 0: General requirements
IEC 60079-11 : 2011
Edition: 6.0
Explosive atmospheres - Part 11: Equipment protection by intrinsic safety "i"
IEC 60079-15 : 2010
Edition: 4
Explosive atmospheres - Part 15: Equipment protection by type of protection "n"
 
This Certificate does not indicate compliance with electrical safety and performance requirements other than those expressly included in the Standards listed above.


 
TEST & ASSESSMENT REPORTS:A sample(s) of the equipment listed has successfully met the examination and test requirements as recorded in

 
Test Report:
DE/TUN/ExTR11.0005/00DE/TUN/ExTR11.0005/01


Quality Assessment Report:

DE/PTB/QAR06.0007/03DE/PTB/QAR06.0008/05


- PAGE BREAK -

IECEx Certificate
of Conformity

 
Certificate No.:IECEx TUN 11.0003X
 
Date of Issue:2014-07-18Issue No.: 1
 
Page 3 of 4
 
 
Schedule
 
EQUIPMENT:
Equipment and systems covered by this certificate are as follows:
 

For technical data and further details see attachment.

 
SPECIFIC CONDITIONS OF USE: YES as shown below:
 

 1.   The High Density Fieldbus Power Hub System has to be erected in such a way, that 

      corresponding to IEC 60079-15 a degree of protection of at least IP 54 according to IEC 60529

      is achieved. 

 

2.   The connection and disconnection of the modules and energized non-intrinsically safe circuits

     is only permitted if no explosive atmosphere exists.

 

3.   The High Density Fieldbus Power Hub System has to be erected in such a way, that a pollution

     degree 2 or less, according to IEC 60664-1 is achieved, if an intrinsically safe limited voltage

     according to IEC 60079-11:2011 is used.

 

 


- PAGE BREAK -

IECEx Certificate
of Conformity

 
Certificate No.:IECEx TUN 11.0003X
 
Date of Issue:2014-07-18Issue No.: 1
 
Page 4 of 4
 
 
DETAILS OF CERTIFICATE CHANGES (for issues 1 and above):
 
A safe limited voltage according to IEC 60079-11 and two new motherboards had been introduced.
 
 








Copyright © IEC-IECEx 2016 , Geneva Switzerland. All rights reserved.